Minutes 09/07/07

Tameside Cycling Forum

Meeting held 6.00pm - Monday 9th July 2007 at Ashton Council Offices

1. Attendance

Present:

Nigel Gilmore - Tameside MBC (Chair)
Peter Brocklehurst - Janus C C
Michelle Murphy - Tameside MBC
Dave Colins - CTC
Colin Ellis - Dukinfield CC
Alan Pickles - Cyclist
Dave Chadderton - MCRC
Ian Saxon - MCRC
Janis Hett - Dowson Go Ride
Stuart Bailey - Sustrans Ranger
John Bloomfield - Cyclist
Chijioke Ebizie - Tameside MBC

Presentation - Mike Hughes - ROW TMBC

Apologies:

Cllr Doubleday - Member TMBC  

2. Rights of Way Improvement Plan

  1. MH gave a presentation on Tameside's Rights of Way Improvement Plan. The presentation is one of a series to be given before the document goes out for general consultation.

3. Minutes of Meeting Monday 2nd April 2007 and Matters Arising

  1. The previous minutes were accepted as a correct record.
     
  2. NG confirmed that Tameside MBC Engineering staff are using COPECAT.

4. Draft Terms of Reference for Discussion and Approval

  1. NG presented a revised draft "Terms of Reference". He explained the need for the Forum to shift focus to more strategic matters. 
     
  2. In discussion comments received included:
    • DC asked for the inclusion of "Experienced Cyclists" within the categories of cyclists
    • IS drew attention to the omission of Cycling as a Sporting activity
       
  3. In response to a question by IS, MM will check with the Sport & Physical Activity Manager regarding the promotion of any bike circuit within the borough.
    School Travel Plans to be included in the new "Terms of Reference"
     
  4. NG urged members to send in any suggestions by the 23rd of July for consideration to the final draft

5. Update on Taking Forward the Tameside Cycle Strategy

  1. Tameside MBC is in the process of appointing a Consultant to carry out a strategic review of cycle routes in Tameside. The Consultant will commence work in September, present his interim report at the next Forum meeting and the final report a week later.

    PB & DC requested a meeting with the Consultant, to input their local cycle knowledge. 
     
  2. The existing draft strategy previously approved by forum members will be updated to include latest figures and the outcomes of the work to be undertaken by consultants looking at the whole route network.
     
  3. The approved spending on cycling this Financial Year is £145K. The Transport Innovation Fund (TIF) bid, if successful will see a sea change in the way our roads operate.

6. Progress Reports

Item

Scheme

Description

Action

1

Acresbrook/Mottram Road

New Traffic signal controlled junction to be created. Pedestrian refuges to be removed and cycle lanes maintained.

Remove from list

2

Route development NCN66

Design work commenced on the NCN66 link to Park Bridge Heritage Centre.

Discussions are also taking place with British Waterways for access along the Peak Forest canal towpath.

 

Work ongoing

3

Route Development RCN85

For RCN85 Tameside MBC is currently in consultation with British Waterways to use a section of the Ashton canal towpath

Work ongoing

4

Oxford Park ( Stockport Road )

Cycle Lanes to be extended to Guide Lane (A6017) from Oxford Park

Work ongoing

5

Ashton to Stalybridge cycle route

Part of the Strategic study

Work ongoing

6

Stockport Road (NCN62)/ Wakeling Road

Scheme currently being reviewed

Work ongoing

7

Stockport Rd/Two Trees Lane Junction.

Part of the Strategic Cycle review

Work ongoing

8

Cycle Maps for Tameside

Copy Right issues preventing reprint

Work ongoing

9

Connect 2 Lottery Bid

Both Tameside related bids are on the reserve list

Remove from list

10

TPT (NCN62)

  • Hurst Clough
  • Kerry Foods
  • Greatwood
  • Work on Hurst Clough completed
  • Kerry Foods undergoing a Safety Audit
  • Greatwood nature reserve (CEb to arrange meeting with Countryside Office).

Hurst Clough remove from list

11

Dowson Primary School

Planning application submitted. £63K grant available from SUSTRANS. Match Funding to the tune of £210K being arranged by TMBC

Work ongoing

12

M60/M67 West to East crossing and the M67 crossing in Hyde

Meeting has taken place with Highways Agency and proposals are to be sent to their offices for both schemes.

Work ongoing

13

Higher Henry Street , Hyde

Traffic Management considering a proposal to create a cycle bypass

Work ongoing

  1. In response to the above several comments were raised and included:-
    • DC - Could we have better location maps at subsequent meetings.
    • JH - (Item 6.5) Sustrans representative in Manchester has identified the crossing at this point to be unsafe.

7. Any Other Business

  1. PB asked whether the Tameside website could be updated. CEb agreed to look into this.
     
    As part of updating the site it was suggested that a new email address be set up 2cycling@tameside.gov.uk".
     
  2. PB asked are there adequate direction signs showing locations of cycle stands in Ashton?
     
  3. DCh asked what happened to the request for a bike circuit in Tameside, with particular reference to Mossley. In response CEb stated that the Council is looking to identify an 8mile all terrain bike circuit in Ashton. CEb to update at next meeting.
     
  4. The Tameside Tour 2007 took place on the 8 th of July. 60 people took part including Cllrs Andrew Doubleday and Kieran Quinn. It is hoped that at the January Forum next year's event date can be agreed by all, to avoid future clashes.

8. Date of Next Meeting

8th October 2007 @ 6.00pm.